Follow Us On: LinkedIn LinkedIn  |  Twitter Twitter  |  FaceBook Facebook  |  Blogs Blogs  |  YouTube YouTube Login
Construction Monkey

Depth of Duct Bank:
Depth Measured from Grade to:
Number of Conduits Wide:
Number of Conduits High:
Type of Conduit:
Size of Conduits:
Spacing of Conduits
Spacing Measured
Length of Duct Bank:
Type of Fill Around Conduits:
Minimum Concrete Coverage on Top:
Minimum Concrete Coverage on Bottom:
Minimum Concrete Coverage on Left:
Minimum Concrete Coverage on Right:
Duct Bank Width:38.0 in |  3 feet 2 inches
Duct Bank Height:21.0 in |  1 feet 9 inches
Trench Depth:57.0 in |  4 feet 9 inches
   
Volume of Excavation: Help1,504.2 ft3 |  55.7 yd3
Volume of Concrete: Help465.8 ft3 |  17.3 yd3
Volume of Backfill: Help950.0 ft3 |  35.2 yd3
   
Volume of Duct Bank: Help554.2 ft3 |  20.5 yd3
Volume of Spoils: Help554.2 ft3 |  20.5 yd3
Volume of Conduit: Help88.4 ft3 |  3.3 yd3

No guarantees are made as to the accuracy of the calculation or compliance with local codes.  Verify all calculations with a professional engineer. If you find an error, or have a suggestion, please send us an email.
Construction Monkey Product Explore Company
Construction Monkey was formed to fill a need in the Construction Industry that has been forming for several years. The industry has become increasingly dominated by General Contractors that subcontract more and more of the work and thus there are more subcontractors providing the real "construction" services on any given project. These subcontractors are burdened with the risk, performance, safety, quality, and management of the projects being built, while they are in a more competitive market space due to the nearly 800,000 specialty subcontractors in the US alone. The Monkey is here to help subcontractors perform at top levels in this difficult environment. Overview
Pipeline/Bid Management
Blogs
Calculations
FAQ
Pricing
Site Map
Site Access
ROI Calculator
Help
About Us
Company News
Contact Us